Sunday 8 September 2013

Gyprock

The insulation and gyprock was done this week and it looks great so far. The cornices still need to go up and should be completed soon. The verandah floor went up this week too so it was a very busy week. Very excited for next week as the stairs go in Monday, the doors go on Tuesday (so hopefully house will be at lock up stage this week- Yay!) and the kitchen goes in on Friday. 

 Here you can see the lounge room and our sliding doors

 Our kitchen with the drop ceiling and window splash back.The door leads into the walk-in pantry

The front lounge room with cedar windows. The black plastic is there to protect them as they have not been stained yet.

 View at the front door looking towards the back of the house

 The verandah

What our house looks like so far. Some of the cedar cladding still needs to be stained and the verandah needs to be finished. Hopefully the site will be cleaned soon as there is a fair bit of rubbish lying around. 

2 comments:

  1. Excellent work Demonstration for plastering & Home improvement.Each work is going in a smooth and in particular time manner. Keep it up.....
    Gyprocker

    ReplyDelete
  2. Exactly, you're very kind of us about comment!. Qualified Contractor

    ReplyDelete